NEWS
Camp Pendleton Replacement Hospital
Component West, Inc., a wholly owned subsidiary of Component Assembly Systems, Inc., has a Design Build contract with the Clark/McCarthy Joint Venture on the $440,000,000 state of the art healthcare project in San Diego, California. Component West is responsible for the design and construction of over 600,000 square feet of interiors that includes metal framing and drywall as well as all exterior framing and sheathing, complete with Anti-Terrorist Forced Protection blast design. Component West is also an integral part of the Building Information Modeling team, essential for design efficiency, clash detection and cost control.
 
San Diego Airport Expansion
The San Diego Airport expansion will double the size of the existing Terminal 2 and will allow for ten additional gates. The expanded terminal will include shops, a large waiting area with an atrium and a stage for music, dance and other performances. The "Green Build" project, performed for the Turner / PCL / Flatiron Tri-venture, encompasses 350,000 square feet and is scheduled to be opened in June 2013.

 
Sycuan Casino and Hotel
This project is a 2 Floor Casino Renovation encompassing the latest technology to upgrade the massive gaming floors. Scheduled to be completed in the Summer of 2011, the gaming floors will remain fully operational during renovation. All work will be performed after hours to minimize the effect of construction on the gaming operations. The gambling floors will receive new acoustic, metal, and wood ceilings that allow it to be the final touch of a "Las Vegas Style" casino located in cosmopolitan San Diego.
 
Locations
New York
Massachusetts
Washington D.C.
Locations
Locations
Locations
Locations